Updates and Results Talks and Posters Advice Ideas Important Figures Write-Ups Outreach How-To Funding Opportunities GENETIS
  GENETIS  ELOG logo
Message ID: 243     Entry time: Mon Jun 2 14:10:59 2025
Author: Jacob Weiler 
Subject: Building Status 06/02/2025 

We are almost to where we can start the physical building of the antenna! 

I've attached all the information I currently have regarding the building project. Some of it is messy work notes and some is well-structured.

I’ve attached the following files for the GENETIS building project:

  • Building Dump.txt 
    • My working notes that I used while trying to simulate the antenna in XFdtd (very messy) 
  • Building Dump of Useful Materials.txt
    • List of materials that I found regarding the building project like slides, elogs, etc.
  • Simulating Building Model.txt
    • A writeup I made describing my process for simulating the antenna in XFdtd 
  • Done with change materials.zip
    • Solidworks model of antenna

I also made a slide deck that contains the directory locations + has graphs HERE.

Attachment 1: Building_Dump_of_Useful_Materials.txt  2 kB  Uploaded Mon Jun 2 15:12:45 2025  | Show | Show all
Attachment 2: Simulating_Building_Model.txt  7 kB  Uploaded Mon Jun 2 15:12:55 2025  | Show | Show all
Attachment 3: Building_Dump.txt  7 kB  Uploaded Mon Jun 2 15:13:01 2025  | Show | Show all
Attachment 4: done_with_change_materials.zip  4.621 MB  Uploaded Mon Jun 2 15:13:09 2025
ELOG V3.1.5-fc6679b