Updates and Results Talks and Posters Advice Ideas Important Figures Write-Ups Outreach How-To Funding Opportunities GENETIS
  GENETIS  ELOG logo
Message ID: 48     Entry time: Mon May 11 17:56:36 2020
Author: Julie Rolla 
Subject: GENETIS Meeting Update 

We met today for a long time and pushed to catch up. The following is what we have done:

(1) Worked for a bit on our current tasks. They will work on these current tasks before they start on their summer projects. 

  • Antenna database (Julie, Alex P., Alex M.)
  • Worked on a paper outline (Julie, Alex M.)
  • Worked on wall time variable (Eliot, Evelyn, Leo)

       Note I also have to: (1) Fix merge conflict and make sure students are good about only editing the dev branch moving forward. (2) Get branches and GitHub set up for both the asymmetric bicone and the non-linear bicone. 

(2) Went over the details of how the loop works as a group.

  • Went over how each piece works.
  • Went over how to run it. 
  • Went over best ways to test new edits. 

(3) Went over summer tasks.

  • Eliot: Add parameters to bicone (ie make bicone asymmetric)
  • Julie & Alex M.: Paper, and helping others
  • Alex P.: Frequency database for AraSim (to speed up AraSim)
  • Evelyn & Leo: Make non-linear bicone (wiggly sides) 

 

 

 

ELOG V3.1.5-fc6679b